Hey Gino,

Since you are probably limited by time i didn't want to hold things up
while i dig up all the photos and schematics.  so to get you started i'd
suggest a system like this:

https://www.wholesalesolar.com/1890130/wholesale-solar/complete-systems/1.04-kw-watt-telecom-off-grid-dc-24-48v

we use this supplier a lot and they are great to work with and their prices
are decent.

they provide the schematics for how it all gets connected and if you get 5
hours of sunlight per day (which you should in PR even on Dec 21st) then
this system will power a 200W tower just fine.  if your tower uses 300W
then just add 2 more panels (and another 30A breaker) and you can still use
the same morning star 60A charge controller.  If your tower uses more than
300W then keep adding panels, charge controllers and Batts.

You'll need to add batteries, connecting cables  and another 80A breaker
(for battery cutoff) to this parts list.  we use UB-4D AGM 200 ah 12 VDC
Battery at our towers.  we usually have 12 of them at a site but we are in
CO and in December we will go for 2 weeks without any sun (I doubt you have
that issue).  you could probably get away with 4-8 of them per tower.

the other item you want to add is this:
http://store.packetflux.com/sitemonitor-interface-for-morningstar-serial/
and this:
http://store.packetflux.com/sitemonitor-base-unit-ii/

the morning start controller does have an ethernet port but you can use
SNMP to query the device and graph everything, you can only look at their
stats page.  it's much easier to do graphing and alerting with the
packetflux devices.

***Be sure to fuse and breaker everything you can***  you want (and need)
to be able to turn off all power coming from the panels or batts when you
need to work on the system.  (that's what the 80A breaker in the parts list
is for.)


for the load side of things you can use these fuse blocks.  they use the
car style blade fuses you can get at any parts store or order online.

*Qty.* *Stock#* *Mfr. Part #* *Cust. Part #* *Price (USD)* *Total (USD)*
2 70169109
<http://www.alliedelec.com/search/productdetail.aspx?SKU=70169109> 0801733
$5.740 $11.48
  DIN Rail; Steel; Silver; 7.50 mm; 35 mm; 2 m
  *Ship Method:*   FedEx 2nd Day
6 70169386
<http://www.alliedelec.com/search/productdetail.aspx?SKU=70169386> 0203250
$9.040 $54.24
  Fixed Bridge Bar; Term Blk; Universal; 10; Silver
  *Ship Method:*   FedEx 2nd Day
12 70169605
<http://www.alliedelec.com/search/productdetail.aspx?SKU=70169605> 3047167
$0.690 $8.28
  Partition Plate; Term Blk; Gray; 50 mmL; 2 mm W; 48 mm H
  *Ship Method:*   FedEx 2nd Day
40 70169133
<http://www.alliedelec.com/search/productdetail.aspx?SKU=70169133> 3118203
$9.910 $396.40
  Conn; Term Blk; Fuse; 1; 2; 26-8AWG; 30A; 300V; 4kV; M4; 1.5Nm; Flat; PA;
10mm
  *Ship Method:*   FedEx 2nd Day
40 70169365
<http://www.alliedelec.com/search/productdetail.aspx?SKU=70169365> 3004362
$0.960 $38.40
  Conn; Term Blk; Feed Thru; Screw Clamp; 2; 0.2-6sq.mm; 24-10 AWG; 6.2 mm
W; Gray
  *Ship Method:*   FedEx 2nd Day
4 70169390
<http://www.alliedelec.com/search/productdetail.aspx?SKU=70169390> 0203263
$11.880 $47.52
  Fixed Bridge Bar; Term Blk; Universal; 10; Silver
  *Ship Method:*   FedEx 2nd Day


hit me up if you need help figuring all this out!

also what i've described here is for a totally off grid site.  if you are
looking to grid tie in then that's a whole different beast.

hope this all helps!

-sean



On Wed, Oct 4, 2017 at 5:39 AM, Gino A. Villarini <[email protected]> wrote:

> Please
>
> From: Af <[email protected]> on behalf of Sean Heskett <[email protected]
> >
> Reply-To: "[email protected]" <[email protected]>
> Date: Tuesday, October 3, 2017 at 10:07 PM
> To: "[email protected]" <[email protected]>
> Subject: Re: [AFMUG] Good - Cost Effective MPPT Solar Controller?
>
> Hey Gino,
>
> We have 3 solar sites on our network. Let me know if you want me to send
> pics, schematics and parts list so you don't have to re-invent the wheel.
>
> - sean
>
>
>
> *Gino A. Villarini*
> President
> Metro Office Park #18 Suite 304 Guaynabo, Puerto Rico 00968
>
> On Tue, Oct 3, 2017 at 10:49 AM Gino A. Villarini <[email protected]>
> wrote:
>
>> Any pointers?
>>
>>
>>
>> *Gino A. Villarini*
>> President
>> Metro Office Park #18 Suite 304 Guaynabo, Puerto Rico 00968
>>
>>

Reply via email to