Am 10.12.2009 13:49, schrieb CKoenig:
Think not. When I sum up all Remaining Times (from all tasks in the
sprint), the calculated value for the Total Remaining Time at the
bottom of the table for the sprint shows a value larger than the sum
of all tasks. Think that does not have to do anything with the User
Story Points, right?

It could if you have user stories without tasks. If all your user stories have tasks attached, the increase should not happen.

fs

Attachment: smime.p7s
Description: S/MIME Cryptographic Signature

Reply via email to