Roland, I have a part of some big project based on pipelines. Is it possible to roughly denote that time points of pipelines removing and new streams introducing? Will there be some time frame these technologies be existing in parallel? - to have an opportunity to smoothly switch a code base: pipes still exist, and new streams are at least close to release.
-- >>>>>>>>>> Read the docs: http://akka.io/docs/ >>>>>>>>>> Check the FAQ: http://akka.io/faq/ >>>>>>>>>> Search the archives: https://groups.google.com/group/akka-user --- You received this message because you are subscribed to the Google Groups "Akka User List" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at http://groups.google.com/group/akka-user. For more options, visit https://groups.google.com/groups/opt_out.
