Hi,

draft-08 seems to be missing definition on 'cost-constraints' field in
Filtered Cost Map and Endpoint Cost capability objects. The field is
shown in the IRD output example (section 7.6.3) and 'support for cost
constraints' is referenced in 7.7.3.2.3, but going through the pointers,
one arrives at 7.7.2.2.4 which defines only cost-modes and cost-types. I
think 7.7.3.2.4 needs to extend the capabilities defined in 7.7.2.2.4
and 7.7.5.1.4 should reference that.

Bye,
Robert
_______________________________________________
alto mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/alto

Reply via email to