Hi Robert, On Wed, Jun 22, 2011 at 8:24 AM, Robert Varga <[email protected]> wrote: > Hi, > > draft-08 seems to be missing definition on 'cost-constraints' field in > Filtered Cost Map and Endpoint Cost capability objects. The field is > shown in the IRD output example (section 7.6.3) and 'support for cost > constraints' is referenced in 7.7.3.2.3, but going through the pointers, > one arrives at 7.7.2.2.4 which defines only cost-modes and cost-types. I > think 7.7.3.2.4 needs to extend the capabilities defined in 7.7.2.2.4 > and 7.7.5.1.4 should reference that.
Yes, that is a bug that we will fix in the update. Your proposed correction is indeed the way it was intended. We will try to get an update with this correction and others mentioned on the list out by Monday. Thanks, Rich > > Bye, > Robert > _______________________________________________ > alto mailing list > [email protected] > https://www.ietf.org/mailman/listinfo/alto > _______________________________________________ alto mailing list [email protected] https://www.ietf.org/mailman/listinfo/alto
