Hi,Richard: Thank for bring these examples. I see these examples from two perspectives:
1. What cost metrics we should define? 2. When, where and how to calculate these metrics (i.e., methodology ). I think we can not define these cost metrics from scratch, we can not define all the metrics we think useful. Instead, we should define them mostly based on standardized work, AT&T have a good practice for measuring these metrics. But I believe AT&T also doing a good job in standardizing these metrics and associated methodology,e.g., in IETF IPPM WG. Therefore I think we should try to reuse the existing methodology associated metrics defined somewhere. Also I believe we are not intending to design ALTO as the whole measurement system or measurement platform. What ALTO server should do is to gather/aggregate/abstract/filter useful metrics in a standard way and provide them to the alto client or use them as filtering to choose appropriate endpoint to connect. Regards! -Qin From: [email protected] [mailto:[email protected]] On Behalf Of Y. Richard Yang Sent: Monday, October 21, 2013 9:25 AM To: Qin Wu Cc: IETF ALTO; [email protected] Subject: Re: [alto] ALTO Extension: Defining a Cost Metrics document? Hi all, Just a thought, some networks already provide public performance metrics, and ALTO should be able to provide such info in a standard way and cover these metrics, if we agree: -AT&T - http://ipnetwork.bgtmo.ip.att.net/pws/averages.html - http://ipnetwork.bgtmo.ip.att.net/pws/network_delay.html shows latency, loss, jitter, reliability, modem success rate - In particular, the link provides a methodology page (http://ipnetwork.bgtmo.ip.att.net/pws/glossary.html), which points to a major challenge in defining the metrics: metrics have parameters (e.g., the AT&T link specifies 15-min interval for latency), and I assume that ALTO cannot work with a single interval, but then how do we handle parameters? - CenturyLink (formerly Qwest): - https://kai04.centurylink.com/PtapRpts/Public/BackboneReport.aspx shows jitter, latency, pkt delivery rate, availability ... And we could think that ALTO could be extended to be used as a standard way to check on the service outage of an endpoint (http://customer.comcast.com/help-and-support/cable-tv/outages-in-your-area/), which may imply performance metrics as well... Thanks. Richard On Mon, Oct 14, 2013 at 2:30 AM, Qin Wu <[email protected]<mailto:[email protected]>> wrote: From: [email protected]<mailto:[email protected]> [mailto:[email protected]<mailto:[email protected]>] On Behalf Of Y. Richard Yang Sent: Monday, October 14, 2013 7:20 AM To: IETF ALTO Cc: [email protected]<mailto:[email protected]>; Qin Wu Subject: [alto] ALTO Extension: Defining a Cost Metrics document? Dear all, I am reading up on the documents that define cost metrics. The motivation is that the base ALTO protocol (http://www.ietf.org/id/draft-ietf-alto-protocol-20.txt) has defined only one Cost Metric: 'routingcost': - Defined the semantics at Sec. 6.1.1.1 of , and then listed it at Table 3. - Used "hopcount" in examples of Sec. 9.2.3 and 9.2.4, but the semantics of not formally defined. Given the aforementioned state of the base protocol, I see good value in that the WG produces a WG document that defines a relatively complete set of Cost Metrics. I particular, I read the following: - http://tools.ietf.org/html/draft-lee-alto-app-net-info-exchange-02 (Sec. 3.4 introduced three metrics: hopcount, latency, pktcost, and cost) - http://tools.ietf.org/html/draft-wu-alto-json-te-01 Defined a set of metrics: in Sec. 4. This work, as stated in the document, is motivated by - http://www.ietf.org/id/draft-ietf-ospf-te-metric-extensions-04.txt During the review of ALTO base protocol, we are suggested to document performance metrics (cost metrics) per the guideline of - RFC 6390 Guidelines for Considering New Performance Metric Development. A. Clark, B. Claise. October 2011. (Format: TXT=49930 bytes) (Also BCP0170) (Status: BEST CURRENT PRACTICE) Here a first question, I have, is whether the authors will produce a "simple" document, at the upcoming IETF, whose only purpose is to: define a set of cost metrics, including the nameing, the semantics, ... following the guideline per RFC 6390, that can benefit the base protocol. [Qin] This is exactly what I we are doing in draft-wu-alto-json-te. We are checking if we can give a complete list of cost metrics that are built based on draft-ietf-idr-ls-distribution-03,RFC5305, draft-wu-idr-te-pm-bgp<http://tools.ietf.org/id/draft-wu-idr-te-pm-bgp-02.txt>,draft-ietf-ospf-te-metric-extensions-04, draft-ietf-isis-te-metric-extensions-01. We will further generalize them to firstly have some base metrics that can applied either to the whole path or any link in the path and then have Derived metrics that are link specific. The update (v-02) will come in a few days. I feel that such a document is focused, and has good value by itself. The implications of the introducing multiple cost metrics can be explored in another document, which I will send in another email shortly. Thanks. Richard
_______________________________________________ alto mailing list [email protected] https://www.ietf.org/mailman/listinfo/alto
