On Sat, 6 Apr 2013 11:10:58 -0400 Phil <[email protected]> wrote:

:>I'm trying to front-end some existing IKJEFT1B job steps to do some setup & 
checking before and
:>cleanup after.   In my testing, any abend generates an 04C, which is fine, 
however my ESTAI routine
:>does not seem to get control in this case for me do the cleanup (which could 
be disastrous).  Anyone
:>have experiences with this?  I suppose I could go back to IKJEFT01.  :(

1. Does the ECB post code indicate an abend?

2. Did you try some footprints in your ESTAI?

P.S. This discussion would be more appropriate to IBM-MAIN as your problem is
not related to assembler.

--
Binyamin Dissen <[email protected]>
http://www.dissensoftware.com

Director, Dissen Software, Bar & Grill - Israel


Should you use the mailblocks package and expect a response from me,
you should preauthorize the dissensoftware.com domain.

I very rarely bother responding to challenge/response systems,
especially those from irresponsible companies.

Reply via email to