At 10:53 PM 22/01/02 +1030, Terry wrote:
>Incidentally I doubt that the GFA Ops manual has a procedure for thermaling in
>company with machinery sheds (or part thereof).

I suspect 
- that it would be the machinery shed which would set the direction of
circle, even if it wasn't the first into the thermal,
- that the horizontal and vertical separations applicable would be measured
between the sailplane and the nearest loose item at that moment, having
formed part of the original machinery shed
- that the applicable loose item being measured to might change several
times during the climb
- the duration of sailplane climb be a hyperbolic function between pilot
bravery and rate of decision making
- the event form a new category in the Darwin awards
--
Emilis Prelgauskas
B.ARCH  ARAIA
[EMAIL PROTECTED]


--
  * You are subscribed to the aus-soaring mailing list.
  * To Unsubscribe: send email to [EMAIL PROTECTED]
  * with "unsubscribe aus-soaring" in the body of the message
  * or with "help" in the body of the message for more information.

Reply via email to