+1

I would like to se my build changes go out as part of the official 1.0
release, so an RC2 which contains them is preferrable to me

Matt Seibert                                           [EMAIL PROTECTED]
IBM        External:    (512) 838-3656      Internal:   678-3656


                                                                                       
                                       
                      Sam Ruby                                                         
                                       
                      <[EMAIL PROTECTED]        To:       [EMAIL PROTECTED]       
                                       
                      >                        cc:                                     
                                       
                                               Subject:  [vote] Release plan for a 1.0 
rc2 release                            
                      09/20/2002 13:04                                                 
                                       
                      Please respond to                                                
                                       
                      axis-dev                                                         
                                       
                                                                                       
                                       



The goal of the rc2 release is simply to package up all of the fixes
made since the rc1 release in a form convenient and conducive for a
wider audience to test and provide feedback on.  As such, there are no
list of "must fix bugs" for this particular release.

The plan is to cut a branch for this release late Sunday night, and to
build a release from that branch, preferably on Monday morning.  Bug
reports for this release are to posted to bugzilla, specifying "1.0-rc2"
as the version.

I'll volunteer to be the release manager for this release.

- Sam Ruby



Reply via email to