Is it possible to set specific dates in the Bareos schedule.
For example, if I wanted a backup to be done on September 3rd, 2015 and October 
16th, 2015. It is possible to state those dates in the schedule?

All the examples I see for Bareos/Bacula  shows the 1st Fri, the 4th Sun, 
2nd-4th Sat, etc.  I'd like to schedule some jobs that don't typically fit in 
the conventional schedule.


Thanks.

-- 