Hello Conrad,

please refer to the documentation:
http://doc.bareos.org/master/html/bareos-manual-main-reference.html#ScheduleResource

Am 21.08.2015 22:49, schrieb Conrad Lawes:
Is it possible to set specific dates in the Bareos schedule. For example, if I 
wanted a backup to
be done on September 3rd, 2015 and October 16th, 2015. It is possible to state 
those dates in the
schedule?

You cannot specify the year, but September 3rd is possible.

 Run = sep 3 at 12:00
 Run = oct 16 at 12:00

Will do exactly what you ask for.


All the examples I see for Bareos/Bacula  shows the 1st Fri, the 4th Sun, 
2nd-4th Sat, etc.  I'd
like to schedule some jobs that don't typically fit in the conventional 
schedule.


Thanks.



--
Mit freundlichen Grüßen

 Philipp Storz                             [email protected]
 Bareos GmbH & Co. KG                      Phone: +49 221 63 06 93-92
 http://www.bareos.com                     Fax:   +49 221 63 06 93-10

 Sitz der Gesellschaft: Köln | Amtsgericht Köln: HRA 29646
 Geschäftsführer: Stephan Dühr, M. Außendorf,
 J. Steffens, P. Storz, M. v. Wieringen

--
You received this message because you are subscribed to the Google Groups 
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to