Hello, I try to configure a schedule, which runs in 8 week cycles.
pool "week1" w01/w08 pool "week2" w02/w08 .. pool "week8" w08/w08 As I (now) understand and interprete (now) the manual this will backup w00, w08, w16 and so on in pool week1 w01, w09, w17 and so on in pool week2 .. by w00, w01, w02 bareos thinks in ISO depended specified No. of week of the year. As you can extrapolate there will be a week w52 which goes onto pool week4. What I would like to have is, that then the new week 1 (w00) of the next year will be stored in pool week5. id est, I'd like to have a real 8week cycle totally independed from any ISO spec of "date". I do not wanna think in "date" - specific terms. In all schedules configuration I got to know besides bareos, this can be done by provide a start date and configure a weekly cycle (e.g. windows scheduled tasks, cognos scheduler, other backup system e.g like Veritas, SEP Sesam). How can this be done in Bareos ? Can someone give me a hint ? Best Regards, A.Emm -- You received this message because you are subscribed to the Google Groups "bareos-users" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. For more options, visit https://groups.google.com/d/optout.
