Hi there,
this is my schedule set:
Schedule {
Name = "CR-WeeklyCycle"
Run = Level=Full 1st sun at 7:00
Run = Level=Differential 2nd-5th sun at 7:00
Run = Level=Incremental mon-sat at 7:00
}
The backup is stored on a LTO tape, changed manually - no autoloader.
Looking on the schedule, a tape of the increment pool is insert on Saturday
morining.
When now a differential or full backup is started, it checks first if the
right tape is insert.
So I have do by manpower, that the right tape is available before the
backup starts.
All backup jobs like inc, diff and full have spooling active.
Is there a way, that the nackups starts, and spools also if the wring tape
is insert and after changing to the right tape, the despooling process
starts or must I split it each backup in two jobs: copy to hdd and then to
tape?
Thanks for any useful hints, Frank
--
You received this message because you are subscribed to the Google Groups
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email
to [email protected].
To view this discussion on the web visit
https://groups.google.com/d/msgid/bareos-users/7000fa15-2e2c-4224-9602-bf1f94437a85n%40googlegroups.com.