Thanks to everyone that contributed to this update:
----------------------------------------------------
Closed or Unknown Routes:
-------------
Bike Route near Monona Bay: CLOSED for the season
detour:
<http://www.ci.madison.wi.us/transp/bicycle/bike_detour.pdf>
Connector between Dayton & Breeze Terrace: CLOSED
Elver Park Path: Unknown (last known status: CLOSED)
Olin Ave: CLOSED
Odana to Hammersely (Bridge/Connector): CLOSED (as of last
Saturday)
details: The gravel connector is wet & messy (the reporting
cyclist had to walk this section), the bridge is fine.
In town Routes:
--------------
Capital City Trail: Mostly rideable east of Fish Hatchery,
unknown
west of Fish Hatchery. Several sections on the north side of
hills
are ice and slush covered, but these sections are short. Access
under
the Beltline by the railroad tracks is muddy. Look for ice in
the Verona Rd. Underpass
Lake Shore Path: Open but VERY messy
Univ Ave Bike Lane: Open
Wingra Path: Open
Law Park/Lake Monona Path: Open
East Rail Path: Open
Lakeland to Atwood connector: Open
Grand Canyon underpass: Open (look out for ice in the
morning/evening)
Schroeder to McKenna Path (Greenway?): Open
Old Middleton Rd: This is unbikeable in my opinion, although it
might be better going west. The road surface is just horrible.
Escape Routes:
-------------
Seminole Hyw: Excellent
Midtown Road: Fair, some construction activity
Old Sauk Rd: Good, some construction activity
Airport Rd: Good west of Demming, Fair (traffic) east of
Demming
Nesbit Rd: Good
Cross Country: Good
Fitchrona Rd: Good
Broadway: Fair (fast traffic)
Others?
Upcoming Road Closures from Arthur Ross (you should hang on to
his original message, there was lots of good stuff in there):
Other major reconstruction projects with full road closures:
Olin Ave is already closed for bridge replacement over Wingra
Creek.
The Wingra Creek bike path will go along the creek under the new
bridge
when this is done.
Buckeye Road between Stoughton Road (USH 51) and Droster will
also be
completely rebuilt and out of service most of this season. It
will have
bike lanes when done.
The Spooner Street Bridge as mentioned above.
Bedford Street between West Washington Ave and Dayton Street; and
maybe
between Doty St and North Shore.
Reconstruction projects that will narrow streets during
construction,
but the streets will remain open for traffic. These projects are
also
of shorter duration than reconstructs:
Bluff between Ridge and Blackhawk.
Mills between Univ and Regent
Gorham St between Butler and Broom
Campus Drive joint repair work - - there will likely be equipment
and
workers in the shoulders
McKenna Blvd between Raymond and Schroeder. The Elver Park
driveway is
also being relocated a bit, and a traffic signal will go in at
the new
driveway.
If you can add to this list or can update conditions send me
email and I'll update the list.
Cheers,
Joe
--
Joseph J. King
[EMAIL PROTECTED]
madnordski - http://www.danenet.org/madnord/
pgp public key - http://www.kingresearch.com/jk/jking.txt
--