Thanks to everyone that contributed to this update:
----------------------------------------------------
Closed or Unknown Routes:
  -------------
  Bike Route near Monona Bay: CLOSED for the season
    detour:
<http://www.ci.madison.wi.us/transp/bicycle/bike_detour.pdf>

  Connector between Dayton & Breeze Terrace: CLOSED

  Elver Park Path: Unknown (last known status: CLOSED)

  Olin Ave: CLOSED

  Odana to Hammersely (Bridge/Connector): CLOSED (as of last
Saturday)
    details: The gravel connector is wet & messy (the reporting
cyclist had to walk this section), the bridge is fine.

In town Routes:
  --------------
  Capital City Trail: Mostly rideable east of Fish Hatchery,
unknown
west of Fish Hatchery.  Several sections on the north side of
hills
are ice and slush covered, but these sections are short.  Access
under 
the Beltline by the railroad tracks is muddy.  Look for ice in
the Verona Rd. Underpass

  Lake Shore Path: Open but VERY messy

  Univ Ave Bike Lane: Open

  Wingra Path: Open

  Law Park/Lake Monona Path: Open

  East Rail Path: Open

  Lakeland to Atwood connector: Open

  Grand Canyon underpass: Open (look out for ice in the
morning/evening)

  Schroeder to McKenna Path (Greenway?): Open

  Old Middleton Rd: This is unbikeable in my opinion, although it
might be better going west.  The road surface is just horrible.

Escape Routes:
  -------------
  Seminole Hyw: Excellent
  Midtown Road: Fair, some construction activity
  Old Sauk Rd: Good, some construction activity
  Airport Rd: Good west of Demming, Fair (traffic) east of
Demming
  Nesbit Rd: Good
  Cross Country: Good
  Fitchrona Rd: Good
  Broadway: Fair (fast traffic)
  Others?

Upcoming Road Closures from Arthur Ross (you should hang on to
his original message, there was lots of good stuff in there):
Other major reconstruction projects with full road closures: 

Olin Ave is already closed for bridge replacement over Wingra
Creek. 
The Wingra Creek bike path will go along the creek under the new
bridge
when this is done.

Buckeye Road between Stoughton Road (USH 51) and Droster will
also be
completely rebuilt and out of service most of this season.  It
will have
bike lanes when done.

The Spooner Street Bridge as mentioned above.

Bedford Street between West Washington Ave and Dayton Street; and
maybe
between Doty St and North Shore.

Reconstruction projects that will narrow streets during
construction,
but the streets will remain open for traffic.  These projects are
also
of shorter duration than reconstructs:

Bluff between Ridge and Blackhawk.

Mills between Univ and Regent

Gorham St between Butler and Broom

Campus Drive joint repair work - - there will likely be equipment
and
workers in the shoulders

McKenna Blvd between Raymond and Schroeder.  The Elver Park
driveway is
also being relocated a bit, and a traffic signal will go in at
the new
driveway.


If you can add to this list or can update conditions send me
email and I'll update the list.

Cheers,

Joe
--
Joseph J. King
[EMAIL PROTECTED]
madnordski - http://www.danenet.org/madnord/
pgp public key - http://www.kingresearch.com/jk/jking.txt
--

Reply via email to