Thanks to everyone that contributed to this update:
----------------------------------------------------
Closed or Unknown Routes:
-------------
Capital City Path: CLOSED (I added this to the closed list as
reports that have come in have suggested that you need a mountain
bike to use it). There are both good and bad sections,
predictably the good are in the sun soaked areas and the bad are
in the shaded areas of the path. Look for ice in the Verona Rd.
Underpass.
Lake Shore Path: CLOSED (if you're on a mountain bike with
fenders and don't mind some mud on your clothes, it's fine).
Bike Route near Monona Bay: CLOSED for the season
detour:
<http://www.ci.madison.wi.us/transp/bicycle/bike_detour.pdf>
Connector between Dayton & Breeze Terrace: CLOSED
Elver Park Path: Unknown (last known status: CLOSED)
Olin Ave: CLOSED
Odana to Hammersely (Bridge/Connector): CLOSED (as of 3/17)
details: The gravel connector is wet & messy (the reporting
cyclist had to walk this section), the bridge is fine.
Univ Ave. Underpass near Merril Springs: CLOSED
details: The south end is near Eau Claire & Old Middleton Rd.
It's closed due to construction. The detour is to cross at the
traffic light at Whittney Way and University Ave.
In town Routes:
--------------
Univ Ave Bike Lane: Open
Wingra Path: Open
Law Park/Lake Monona Path: Open
East Rail Path: Open
Lakeland to Atwood connector: Open
Grand Canyon underpass: Open (look out for ice in the
morning/evening)
Schroeder to McKenna Path (Greenway?): Open
Old Middleton Rd: This is unbikeable in my opinion, although it
might be better going west. The road surface is just horrible.
Escape Routes:
-------------
Seminole Hyw: Excellent
Midtown Road: Fair, some construction activity
Old Sauk Rd: Good, some construction activity
Airport Rd: Good west of Demming, Fair (traffic) east of
Demming
Nesbit Rd: Good
Cross Country: Good
Fitchrona Rd: Good
Broadway: Fair (fast traffic)
Others?
If you didn't see your favorite route mentioned that's because no
one sent me a report and I've not been out there. My email address
is [EMAIL PROTECTED]
Upcoming Road Closures from Arthur Ross (you should hang on to
his original message, there was lots of good stuff in there):
Other major reconstruction projects with full road closures:
Olin Ave is already closed for bridge replacement over Wingra
Creek. The Wingra Creek bike path will go along the creek under the
new bridge when this is done.
Buckeye Road between Stoughton Road (USH 51) and Droster will
also be completely rebuilt and out of service most of this season. It
will have bike lanes when done.
The Spooner Street Bridge as mentioned above.
Bedford Street between West Washington Ave and Dayton Street; and
maybe between Doty St and North Shore.
Reconstruction projects that will narrow streets during
construction, but the streets will remain open for traffic. These
projects are also of shorter duration than reconstructs:
Bluff between Ridge and Blackhawk.
Mills between Univ and Regent
Gorham St between Butler and Broom
Campus Drive joint repair work - - there will likely be equipment
and workers in the shoulders
McKenna Blvd between Raymond and Schroeder. The Elver Park
driveway is also being relocated a bit, and a traffic signal will
go in at the new driveway.
If you can add to this list or can update conditions send me
email and I'll update the list.
Cheers,
Joe
--
Joseph J. King
[EMAIL PROTECTED]
madnordski - http://www.danenet.org/madnord/
pgp public key - http://www.kingresearch.com/jk/jking.txt
--