> From: "Mark N. Shahan" <[EMAIL PROTECTED]>
> 
> Bikies,
>       Those interested in an access point through the Odana golf course
> parking lot to the SW Path should go to the public hearing listed below.
> MG&E and the American Transmission Company will be installing an electric
> transmission line along the SW Path from Fitchburg to Odana Golf course.
> From Odana Golf Course, the transmission line goes west down Odana Rd. to
> the area just behind Channel 27.  From the Channel 27 area, the line goes
> south to the Beltline right-of-way and goes west to a substation at West
> Towne.
>       The installation of the transmission line will start in early 2003.
> The installation is not suppose to shut down operation of the SW Path.  In
> addition to the connector to the SW Path, a new path will be constructed on
> top of the transmission line from Medical Circle to Grand Canyon Dr. in the
> Beltline right-of-way.
> 
> 
> >From: "Anthony Fernandez" <[EMAIL PROTECTED]>
> >To: <[EMAIL PROTECTED]>
> >
> >Mark,
> >
> >MG&E will be presenting their plans for their electric transmission line
> >project at a public hearing at the Board of Public Works  on Wed, 10/16 at
> >6:30 pm.  This is the project that will be building the bike path
> >connection through Odana Hills golf course from the SW Bike path to Odana
> >Road.  Thought you (and maybe other bikers) might be interested.

---------------
Paul T. O'Leary
Desktop Insurgent
Madison, WI USA

_______________________________________________
Bikies mailing list
[EMAIL PROTECTED]
http://www.danenet.org/mailman/listinfo/bikies

Reply via email to