I just contacted Rob Kennedy of UW Transportation Services about Issues 1 and 2.

For issue 1 - MGE installed and maintains the lights.  Rob will contact them.

For issue 2 - Rob will have it checked out and taken care of. 

For issue 3 - I am trying to verify the responsible person.

Mike Rewey

--------------------------------------------------
On 4 Sep 2013 at 21:40, David Hill wrote:

I have a few comments to make about the Univ Ave Bike Path.

First. I've noticed that the solar lights along the path near Forest Products 
and the VA are at a 
30% INOP status, and have been that way for quite a while now. Nothing seems to 
be in 
place to maintain them. When will the INOP lights be repaired?

Second. The shrubs along the path near the VA have grown to a height that they 
now 
obscure the few remaining lights that work. In addition, the shrubs now take 
over (in spots) 
1/3 of the path. Again, why is there nothing in place to maintain the path?

Third. The path collapse due to shoddy construction from Whitney Way all the 
way along the 
new path section to Allen BLVD. I brought this up with the City last winter 
when a huge sink 
hole developed. There was a patch job done fairly quickly (thanks to those who 
did this), but 
I've noticed within the last two weeks contractors out repairing the road 
sections and making 
motions as if they were going to repair the path, too. They marked and cut 
apart the bike path 
as if they were about to repair the path, then disappeared. Now the path is 
covered with cut 
marks from a saw. The collapsed sections are still collapsed. The patches to 
the path they 
made are crappy. The cuts from the saw are sitting there waiting for the winter 
ice to break 
them apart. The contractors who did it improperly in the first place are no 
where to be seen! 
What is the city doing about this?

David 