Access to the Howard Temin Lakeshore Path at Limnology will be affected (but not closed) starting Tuesday 9/17/13.
Concrete repairs to the walkway north of Limnology are required, so pedestrians will be detoured south around the building (the same route cyclists use to access the path). Limnology's "loading dock" (such as it is) is also on the south side of Limnology, and they often have to store boats there until they can be cleaned (they can't move a boat from one lake to another without cleaning it - otherwise they'd spread invasive species). So the normally narrow space will likely be a crowded narrow space for the duration of the project (about two days). Please slow down and exercise caution as you share the path with others. Chuck Strawser Pedestrian & Bicycle Transportation Planner Commuter Solutions Transportation Services UW-Madison Room 124 WARF 610 Walnut St Madison WI 53726 608-263-2969 www.wisc.edu/trans Sent: Friday, September 13, 2013 11:10 AM Subject: Pedestrian jogging path repairs (N Side of Limnology) Starting Tuesday, Sept. 17, ProAxis LLC will perform concrete coating repairs to the pedestrian jogging lane that runs along the lake on the north side of the Limnology Building. These repairs are necessary to prevent continuing concrete spalling on the underside of the structural slab over the boat entrance to the building. The contractor will be staged on the path on the west side of the building (see attached staging plan). Signage will be placed at both ends of the trail to divert pedestrian traffic around the south side of the building. The work will take approximately two days. [snip]
_______________________________________________ Bikies mailing list [email protected] http://lists.danenet.org/listinfo.cgi/bikies-danenet.org
