Got this on my neighborhood listserv, and thought those using the
Bluff/Kendall corridor would want to know about it. I copied it from a PDF
of a letter to the neighborhood. [Some info about trees, terrace planting,
water shut-offs, and refuse collection removed for brevity.]

>From the info below, it is not clear to me whether 2-way bike access will
be maintained. It only mentions that westbound traffic is OK, and "local
traffic and emergency access will be maintained at all times." Not sure if
that means, "eastbound bicyclists should find another way," or that it will
be torn up and rough, but you will be allowed to ride eastbound.


Project Details – Proposed Work

Water Main: Replace the existing 6” cast iron water main (installed in
1960) and
reconnect services to the new main. See below for service disruptions.

Sanitary Sewer: Minor sanitary sewer extension near N Franklin Street for
future property service (assessable).

Storm Sewer: New storm sewer will be installed from N Blackhawk Rd. to
Palomino Ln.. Storm sewer will be replaced from Ridge St. to Franklin St.
Street: Replace the pavement and replace the existing curb, driveway
aprons, and
sidewalk (assessable) as needed.

Metro Bus: Bus detour for eastbound service. Westbound buses remaining on
Bluff St/Kendall Ave.

Construction Schedule & Impacts

Schedule: June 2015 thru August 2015. The Contractor plans to start in early
June.

Traffic Impacts: Westbound traffic will be maintained. Local traffic and
emergency vehicle access will be maintained at all times.

Driveways: Access will be maintained to driveway unless work is directly in
front of driveway. If driveway, sidewalk or curb and gutter in front of
driveway,
is replaced, driveway access may be removed for up to 20 day. Efforts will
be
made to minimize closures.

On Street Parking: Street parking will be allowed from 7:00 p.m. to 7:00
a.m.
during the weekday. If vehicles are not removed from street by 7:00 a.m.,
vehicles could be ticketed and towed.


Project Contacts

Construction Inspector: Stewart Mael – 520-2399, [email protected]

Construction Engineer: John Fahrney – 266-9091, [email protected]

Traffic: Tom Mohr – 267-8725, [email protected]

Project Engineer: Steve Sonntag – 267-1997, [email protected]

Robbie Webber
Transportation Policy Analyst
608-263-9984 (o)
608-225-0002 (c)
[email protected]
All opinions expressed are my own and do not necessarily reflect those of
my employer or any other group with which I am affiliated.