I rode the eastbound bike lane yesterday without foreknowledge of the closing - 
if it was on this site I missed it. Did not see good detour signage. Glad to 
hear it's almost done.
 


     On Friday, August 14, 2015 12:12 PM, "STRAWSER, Charles" 
<[email protected]> wrote:
   
 

  <!--#yiv1859382601 _filtered #yiv1859382601 {font-family:Calibri;panose-1:2 
15 5 2 2 2 4 3 2 4;} _filtered #yiv1859382601 {font-family:Tahoma;panose-1:2 11 
6 4 3 5 4 4 2 4;}#yiv1859382601 #yiv1859382601 p.yiv1859382601MsoNormal, 
#yiv1859382601 li.yiv1859382601MsoNormal, #yiv1859382601 
div.yiv1859382601MsoNormal 
{margin:0in;margin-bottom:.0001pt;font-size:12.0pt;font-family:"Times New 
Roman", "serif";}#yiv1859382601 a:link, #yiv1859382601 
span.yiv1859382601MsoHyperlink 
{color:blue;text-decoration:underline;}#yiv1859382601 a:visited, #yiv1859382601 
span.yiv1859382601MsoHyperlinkFollowed 
{color:purple;text-decoration:underline;}#yiv1859382601 p 
{margin-right:0in;margin-left:0in;font-size:12.0pt;font-family:"Times New 
Roman", "serif";}#yiv1859382601 p.yiv1859382601MsoAcetate, #yiv1859382601 
li.yiv1859382601MsoAcetate, #yiv1859382601 div.yiv1859382601MsoAcetate 
{margin:0in;margin-bottom:.0001pt;font-size:8.0pt;font-family:"Tahoma", 
"sans-serif";}#yiv1859382601 span.yiv1859382601BalloonTextChar 
{font-family:"Tahoma", "sans-serif";}#yiv1859382601 
span.yiv1859382601EmailStyle20 {font-family:"Calibri", 
"sans-serif";color:#1F497D;}#yiv1859382601 span.yiv1859382601EmailStyle21 
{font-family:"Calibri", "sans-serif";color:#1F497D;}#yiv1859382601 
span.yiv1859382601EmailStyle22 {font-family:"Calibri", 
"sans-serif";color:#1F497D;}#yiv1859382601 span.yiv1859382601EmailStyle23 
{font-family:"Calibri", "sans-serif";color:#1F497D;}#yiv1859382601 
.yiv1859382601MsoChpDefault {font-size:10.0pt;} _filtered #yiv1859382601 
{margin:1.0in 1.0in 1.0in 1.0in;}#yiv1859382601 div.yiv1859382601WordSection1 
{}-->The project to demolish the pedestrian bridge over University Ave between 
Vilas and Humanities, which was supposed to be finished today, will continue 
through at least Monday 8/17/15. (Actually, this is another one of those 
projects that was delayed months while the state budget was being deliberated, 
but that’s another rant).    There will not be any pedestrian (or eastbound 
bicycle) access on the south side of University Ave in the 800 block (by Vilas 
Hall). The sidewalk on the north side of University Ave remains open, 
thankfully, since the Langdon St closure already means fewer ways for bikes and 
peds to get from Park St to Lake St right now. Please be careful out there.    
Chuck Strawser Pedestrian & Bicycle Transportation Planner Commuter Solutions 
UW-Madison Transportation Services    Visit our University Bicycle Resource 
Center at Helen C 
White:http://transportation.wisc.edu/transportation/bike_annex.aspx    How are 
we doing? Take our customer satisfaction survey 
athttps://www.surveymonkey.com/s/CommSol_CSSurvey             
Sent: Friday, August 14, 2015 11:49 AM
Subject: 14H2Z: Univ Ave Bridge: Schedule     REVISED SCHEDULE ON THE PED 
BRIDGE REMOVAL    The last remaining section of bridge was scheduled for 
removal today but the contractor has changed that work to Monday 8/17.   The 
final section of bridge is attached to Vilas Hall so the contractor wants to 
make additional provisions for protecting the building during the demolition 
which requires them to bring in different equipment and take more time to stage 
it.   They didn’t have enough time yesterday to get the additional equipment on 
site so they needed to move the work to Monday.     The contractor will begin 
at 7 am Monday morning using a robotic pneumatic breaker on the bridge deck to 
separate the bridge from the Vilas Hall supporting wall.  Then at 9 am they 
will bring in a crane and remove the bridge deck - mostly intact - and lower it 
to the ground.  Then the deck will be broken apart on the ground and hauled 
away.   The noisiest work will likely be finished by early afternoon.    All 
traffic lanes will be opened on University Ave thru the weekend.  The south 
sidewalk and bike lanes will be closed thru the weekend as equipment & rubble 
are still taking up this area.    The contractor will be working on restoring 
turf and sidewalk starting next Tuesday.      I apologize for any problems this 
change creates to you work.    Civil & Env. Engineer UW-Madison, FP&M, CP&D    
_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org


 
  
_______________________________________________
Bikies mailing list
[email protected]
http://lists.danenet.org/listinfo.cgi/bikies-danenet.org

Reply via email to