On 1/20/07, Dan Nicholson <[EMAIL PROTECTED]> wrote:
> > Randy McMurchy wrote these words on 01/12/07 11:17 CST:
> >
> > > The existing tickets in Trac that are
> > > 1) package updates
> > > 2) slated for the 6.2.0 release
> > > 3) already assigned to an editor
> > >
> > > must be addressed by January 24 or they will be reassigned to
> > > the generic blfs-book (nobody) account and re-evaluated for the
> > > 6.2.0 release.
>
> XFCE-Session could take a bit longer since it forces me to install a
> couple desktops simultaneously and I don't normally do that. But, I
> should be able to do that in the next few days.

Randy, I have two tickets with 6.2.0 milestones, #2172 and #2216. I
should be able to get a workable solution for #2172 in by tonight.
#2216 might have to wait for tomorrow. Is this allowed with your
release schedule, or should they be moved to 6.2.1?

--
Dan
-- 
http://linuxfromscratch.org/mailman/listinfo/blfs-dev
FAQ: http://www.linuxfromscratch.org/blfs/faq.html
Unsubscribe: See the above information page

Reply via email to