Dan Nicholson wrote these words on 01/24/07 12:24 CST:

> Randy, I have two tickets with 6.2.0 milestones, #2172 and #2216. I
> should be able to get a workable solution for #2172 in by tonight.
> #2216 might have to wait for tomorrow. Is this allowed with your
> release schedule, or should they be moved to 6.2.1?

It will be fine. Actually, hard package freeze is not slated until
January 31, and the original outline specifies that we can add
defect fixes and text changes up until the final release.

The only real milestone in the original release schedule that we've
reached is today, which was only to have all package updates either
in the book, or some sort of schedule (such as the KDE update) that
has been discussed and approved.

Summary:

Today was the day that the package updates in Trac are either
1) fixed and finished, or
2) have a definite update plan established

We've received neither on the VSFtpd, OOo, or JDK updates.

-- 
Randy

rmlscsi: [bogomips 1003.26] [GNU ld version 2.16.1] [gcc (GCC) 4.0.3]
[GNU C Library stable release version 2.3.6] [Linux 2.6.14.3 i686]
12:35:01 up 14 days, 12:49, 1 user, load average: 0.04, 0.08, 0.08
-- 
http://linuxfromscratch.org/mailman/listinfo/blfs-dev
FAQ: http://www.linuxfromscratch.org/blfs/faq.html
Unsubscribe: See the above information page

Reply via email to