Dan Nicholson wrote these words on 01/24/07 12:24 CST: > Randy, I have two tickets with 6.2.0 milestones, #2172 and #2216. I > should be able to get a workable solution for #2172 in by tonight. > #2216 might have to wait for tomorrow. Is this allowed with your > release schedule, or should they be moved to 6.2.1?
It will be fine. Actually, hard package freeze is not slated until January 31, and the original outline specifies that we can add defect fixes and text changes up until the final release. The only real milestone in the original release schedule that we've reached is today, which was only to have all package updates either in the book, or some sort of schedule (such as the KDE update) that has been discussed and approved. Summary: Today was the day that the package updates in Trac are either 1) fixed and finished, or 2) have a definite update plan established We've received neither on the VSFtpd, OOo, or JDK updates. -- Randy rmlscsi: [bogomips 1003.26] [GNU ld version 2.16.1] [gcc (GCC) 4.0.3] [GNU C Library stable release version 2.3.6] [Linux 2.6.14.3 i686] 12:35:01 up 14 days, 12:49, 1 user, load average: 0.04, 0.08, 0.08 -- http://linuxfromscratch.org/mailman/listinfo/blfs-dev FAQ: http://www.linuxfromscratch.org/blfs/faq.html Unsubscribe: See the above information page