Hi
After you set the posts in place, you are ready to install the beam. The beam 
runs parallel to the ledger board to hold the joists in place.
   
Steps:
1.
Buy or build a beam of length suitable to the width to be spanned. 2-by-4s can 
be nailed together with plywood spaces to make the width of beam needed.
(Check building codes in your area for the beam width required for your deck 
size.)
  
2.
Turn the beam so that the crown side is up. (Most boards have a slight curve to 
them from one end to another, even when looking down the narrow edge. The
side of the board that bows up in the middle is the crown side.) Placing the 
crown side up prevents sag later.
  
3.
Set the beam on top of the posts and secure it to them. Temporarily secure 
prefabricated post caps to the tops of the posts until all final adjustments
are made. (Post caps are prefabricated metal brackets that fit over the top of 
the post and use a U-shaped bracket to help hold the beam in place.)
  
4.
Check that the beam's overhang is even on both ends.
  
5.
Make the final permanent attachment of the beam to the post caps.
   
Tips:
 
There should be a beam about every 8 to 10 feet along the length of the floor 
joists and a post about every 4 to 8 feet along the length of the beam.
   
It's now considered common practice to use prefabricated "post caps" as they 
add strength and are easy to work with. Post caps are made from galvanized
metal.
   
To check frame to see whether it is square, measure diagonals. If the "box" 
frame is square, the diagonals will be equal.
   
After all the beams are in place you can install the joists.
   
 
Warnings:
 
If you are setting a beam in place above your head, always wear a hard hat and 
be sure your footing is secure.

**********************************************************************
This message and its attachments may contain legally
privileged or confidential information. If you are not the
intended recipient, you must not disclose or use the
information contained in it. If you have received this e-mail
in error, please notify the sender immediately by return
e-mail and delete the e-mail.

Any content of this message and its attachments which
does not relate to the official business of Eraring Energy
must be taken not to have been sent or endorsed by
Eraring Energy. No warranty is made that the e-mail or
attachment(s) are free from computer virus or other defect.
**********************************************************************



[Non-text portions of this message have been removed]



To listen to the show archives go to link
 http://acbradio.org/handyman.html
or
ftp://ftp.acbradio.org/acbradio-archives/handyman/

The Pod Cast address for the Blind Handy Man Show is.
http://www.acbradio.org/news/xml/podcast.php?pgm=saturday

The Pod Cast address for the Cooking In The Dark Show is.
http://www.gcast.com/u/cookingindark/main.xml

Visit The New Blind Handy Man Files Page To Review Contributions From Various 
List Members At The Following Address:
http://www.jaws-users.com/handyman/
Visit the new archives page at the following address
http://www.mail-archive.com/[email protected]/  
For a complete list of email commands pertaining to the Blind Handy Man list 
just send a blank message to:
[EMAIL PROTECTED] 
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/blindhandyman/

<*> To unsubscribe from this group, send an email to:
    [EMAIL PROTECTED]

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/
 


Reply via email to