I am planning on putting in a transfer switch and sub-panel for my generator 
that is a 5.7 K or running at 55700 watts.   Should I put in a 30 amp or 
forty amp transfer switch with a 6 circuit  panel. What I will be placing in 
the sub-panel is a circuit for each of the following. refrigerator, freezer, 
sump pump, furnace, and a 220 well pump. I am not planning on running all 
the above at one time, while running the generator. I will be placing a 
circuit breaker in the main to hook up the transfer switch and removing the 
above circuits for the appliances from the main box and placing them in the 
sub-panel.