Yesterday I did some work on my deck. The first actual work on it this
year. I hung 2 sheets of plywood on the west wall. I had trouble getting the
first sheet out of the stack. Oh man, I hope this isn't any indication of how
things will go. I just could not believe how heavy it was.
I did manage to get it up into place and nailed down. I took a break
before the second sheet. That one went much better. I picked it up, carried
it over and pushed it up into place. All these sheets stand on end with the
bottom level about five and a half feet above standing level.
Today I will put two more up to loosen the muscles and than all hell will
go on Monday if I am up for it. I will need to erect my scaffold to do the
sides and back since those walls only get closed in on the second floor level
with the bottom completely open. The end sheets will be around seven foot off
the ground and the back about nine foot up. Three quarters insulation over
that and dutchlap siding on top.
....................bob
[Non-text portions of this message have been removed]