The floor is finished, with a couple of strategically placed pieces of molding to cover a little extra nick in the vinyl. My wife is happy with it, so all is well. An interesting thing. This is an old house, and there was no flange for hold down bolts for the toilet. The old one was bolted directly to the floor. It had four holes for bolts, so that worked fine. But we replaced the toilet with a water saver, and it had only the two bolt hold downs. The waste line had just a lead flange coming up through the floor, and we were not sure we could get a good enough bite into the floor to hold the toilet down well. A very helpful man at Home Depot showed us a metal ring that we attached to the floor with lag screws, and the hold down bolts for the toilet hooked under that. We did have to cut a little bit of this metal ring off so that the toilet could set on the floor. And no leaks. That's the second time in four years I had to do that floor, and I hope it's the last. Blessings, Tom
[Non-text portions of this message have been removed]
