I have an issue with a number of events on a google calendar which are two weeks off. The original events were entered manually from 02/07/11 to about 05/28/11 and frequent about 4 / week. I need to shift the entire calendars events two weeks into the future.

Net::Google::Calendar appeared to do what I want (yes i know it's alpha) and almost did. I have it getting a list of events and time shifting them. Before I update my calendar with the new times though, I need to get past a bug | user-ignorance. The class has very few but simple to use methods, one of which, ->get_events, returns only events from 4/14/11 through 5/26/11. It's missing the first two months as well as the last day's events. There is nothing else in this calendar as it's specific to this project.

I've tinkered with options, etc, but am confident that the way I'm using it should return what I want. It is not.

The docs uses this line (and so do I) for the example:

    for ($cal->get_events) { }

This is only returning 25 of my ~65 events. I've even set that max-results parameter to 10000 just in case there was a 25 event default limiter to no avail.

Sooooo...

Did I hit the alpha wall?

Am I screwing something up?

Is there another easy-to-use package out there that gives sweet sweet access to google calendar?

Thanks!

John Tsangaris


--------------
|417-208-9013|
-----------------------------------------------------
| Software Engineer      Aries Digital Technologies |
| Deputy             Jasper County Sheriff's Office |
| President                 Faithful Aid Foundation |
| Chairman    Ways and Means Committee, NAMI Joplin |
| Junior Deacon         AF&AM Fellowship Lodge #345 |
| 32°               Scottish Rite, Valley of Joplin |
-----------------------------------------------------


_______________________________________________
Boston-pm mailing list
[email protected]
http://mail.pm.org/mailman/listinfo/boston-pm

Reply via email to