I have an issue with a number of events on a google calendar which are
two weeks off. The original events were entered manually from 02/07/11
to about 05/28/11 and frequent about 4 / week. I need to shift the
entire calendars events two weeks into the future.
Net::Google::Calendar appeared to do what I want (yes i know it's
alpha) and almost did. I have it getting a list of events and time
shifting them. Before I update my calendar with the new times though, I
need to get past a bug | user-ignorance. The class has very few but
simple to use methods, one of which, ->get_events, returns only events
from 4/14/11 through 5/26/11. It's missing the first two months as well
as the last day's events. There is nothing else in this calendar as
it's specific to this project.
I've tinkered with options, etc, but am confident that the way I'm
using it should return what I want. It is not.
The docs uses this line (and so do I) for the example:
for ($cal->get_events) { }
This is only returning 25 of my ~65 events. I've even set that
max-results parameter to 10000 just in case there was a 25 event default
limiter to no avail.
Sooooo...
Did I hit the alpha wall?
Am I screwing something up?
Is there another easy-to-use package out there that gives sweet sweet
access to google calendar?
Thanks!
John Tsangaris
--------------
|417-208-9013|
-----------------------------------------------------
| Software Engineer Aries Digital Technologies |
| Deputy Jasper County Sheriff's Office |
| President Faithful Aid Foundation |
| Chairman Ways and Means Committee, NAMI Joplin |
| Junior Deacon AF&AM Fellowship Lodge #345 |
| 32° Scottish Rite, Valley of Joplin |
-----------------------------------------------------
_______________________________________________
Boston-pm mailing list
[email protected]
http://mail.pm.org/mailman/listinfo/boston-pm