Went operational this morning at the tower site north of I10.. Still need some optimization and tweaking. Power out of the duplexer is only 18 Watts right now. This is because of combining with another VHF system on the tower into the DB224. I need to do a little more isolation in the combiner network... allstar node is not online but will be as soon as I can get to it. will link to 146.94 BPT and thus carry ECR nets and Crossroads linksystem. Mobile coverage to the east is into Vidor so far but there is a little desense in it.. but that will be cleaned up in the near future. Coverage to the West should be well past Channelview, may be Beltway 8 if not beyond. Chris WB5ITTTrustee W5APXWRXZ789 GMRSSociety of Broadcast Engineers Vice Chairman and Frequency Coordinator, SBE134 SE TX/SW LA
________________________________________________ Brazos Valley Amateur Radio Club
BVARC mailing list [email protected] http://mail.bvarc.org/mailman/listinfo/bvarc_bvarc.org Publicly available archives are available here: https://www.mail-archive.com/[email protected]/
