Great job! Sent from my iPhone On May 26, 2025, at 2:53 PM, Chris Boone via BVARC <[email protected]> wrote:
This Message is From an External Sender Caution: Do not click links or open attachments unless you recognize the sender and know the content is safe. Went operational this morning at the tower site north of I10.. Still need some optimization and tweaking. Power out of the duplexer is only 18 Watts right now. This is because of combining with another VHF system on the tower into the DB224. I need to do a little more isolation in the combiner network... allstar node is not online but will be as soon as I can get to it. will link to 146.94 BPT and thus carry ECR nets and Crossroads linksystem. Mobile coverage to the east is into Vidor so far but there is a little desense in it.. but that will be cleaned up in the near future. Coverage to the West should be well past Channelview, may be Beltway 8 if not beyond. Chris WB5ITT Trustee W5APX WRXZ789 GMRS Society of Broadcast Engineers Vice Chairman and Frequency Coordinator, SBE134 SE TX/SW LA ________________________________________________ Brazos Valley Amateur Radio Club BVARC mailing list [email protected] http://mail.bvarc.org/mailman/listinfo/bvarc_bvarc.org Publicly available archives are available here: https://www.mail-archive.com/[email protected]/
________________________________________________ Brazos Valley Amateur Radio Club BVARC mailing list [email protected] http://mail.bvarc.org/mailman/listinfo/bvarc_bvarc.org Publicly available archives are available here: https://www.mail-archive.com/[email protected]/
