--- In [email protected], Baz Juniper <[EMAIL PROTECTED]> wrote:
>
> 
> On 3 Sep 2007, at 21:00, Sue Burchett wrote:
> 
> <snip>
> 
> > If something isn't done with the K & A soon it won't be long 
before  
> > it's a narrow canal. There are reed beds that make passing 
impossible.
> 
> There have always been a few reedy bits, mostly on the Long Pound,  
> but it is noticeably worse this summer - much more reed and some 
of  
> it in dodgy places [inside of sharp bends].  Are there some sort 
of  
> financial restrictions ? :-)
> 
> > Wire lock had the spill weir being repaired and the level was 
18"  
> > down. It looked as though the level is going to be permanently  
> > lower, but we shall see on our return. Higgs lock had workmen  
> > trying to replace the landing stage, this had been completely  
> > washed away. I say trying, as there was a steady stream of boats  
> > both ways preventing any work being done.
> 
> The landing stage has been missing for several years.  For a while  
> there were BW signs on the lock balance beams and the towpath  
> advising boaters to take a stroll from the good bit of bank under 
the  
> A34 bridge.  As it's an urban fringe area I expect the Newbury 
yoof  
> have dealt with those in the normal manner.
> 
> These have been splendid trip reports, Sue - highly enjoyable.  
Thank  
> you.
> 
> Baz
>
The loss of that landing stage has always made me cross! It collapsed 
about 5 years ago when BW had de-watered the pound to replace the 
gates at the lock and at that stage would have been relatively easy 
and cheap to repair. 

But no, they can't do that can they, we have to struggle and suffer 
for the next 5 years while the powers that be "think" about fixing it.

Sorry, mini-rant over, sound a bit like a grumpy old man which I may 