It's interesting, because I've been wondering much of the same thing.  This
could/would be a very useful feature to much of us out there I bleieve.

On Mon, Mar 2, 2009 at 3:22 AM, Ruben Willems <[email protected]>wrote:

> Hi
>
>
> You should better forward this to the devel group, not all devels check the
> user list as often( lack of time)
>
> but coming to your question :
> This sounds indeed intresting, but it will requrie a few of changes I
> think.
>
> Although some could be done with the current code of CCNet :
> Your setup seems a lot like the one of CinnamonDonkey : look in the user
> list for a topic of
> Creating a build farm, Feb 25
>
> he set's using CCNet to check a 'Master'
> al developers code in their own branch, when they think it is ok,
> they may merge it with the trunk, and battery of tests is released on that
> patch
>
> So this sounds a bit like the thing you want, check out the thread ;-)
>
> with kind regards
> Ruben Willems
>
>
> On Sat, Feb 28, 2009 at 6:39 AM, Siddharth <[email protected]> wrote:
>
>>
>> Continuous Integration is an interesting concept no doubt. It is what
>> PM's want. Build and Integration time is seldom assumed on the
>> critical path of any project. What is assumed is integration will be
>> smooth and seamless. Both of which depend on the maturity of the team
>> and the product.
>>
>> More than just seamless integration, projects need to be
>> "controllable" towards the end. And this control should be
>> configurable to enough to ensure no loss to productivity. The other
>> side of the same coin is too much process can over burden the project.
>> But, process is meant to be customized to ensure that the burden :
>> benefits ration are as less as possible.
>>
>> Now, coming to my point. A integration infrastructure needs to have a
>> controlled checkin process. A control checkin process should be linked
>> tightly with the build start time. It should be possible to specify a
>> date from when the controlled checkin will start. From this day
>> onwards, every checkin, should be approved by a user/group (commonly
>> known as a change review board). The review will be based on defect,
>> reproduction steps, code changes, fix changes (code and ANY change),
>> unit test review comments, people involved (lines of code changed,
>> should not be a metric here, makes no sense anyway, since we have the
>> actual code that we need to review before the checkin). A end time
>> should be defined for this approval/review process, beyond which the
>> auto build process will be delayed. OR we should be able to configure
>> approval/review process to be desirable (or mandatory). If a
>> approval / review process is active the communication on the dashboard
>> should reflect the results. Approval/Review process summary should be
>> displayed along with the build results.
>>
>> Build conducted with (in green) / without (in red) the approval/review
>> process.
>> Summary of Approval / Review by change control board
>> - total_checkins
>> - reviewed_checkins
>> - approved_checkins
>> - disapproved_checkins
>> - risks mitigated (by the change review board) - textual communication
>> to the team
>> - risks taken - textual communication to the team
>> - assumptions made - textual communication to the team
>> - Final Decision (Build Safe / Build At Risk / .... some more.. )
>>
>> If this is a interesting idea, I am willing to work closely with the
>> implementation team. Please comment.
>>
>
>