We use our source code repository to control our build content. Since we are a SCRUM shop and we perform releases every two weeks this is not a feature that I would utilize. This sounds more along the line CMM or CMMI type of a process. This would be a great feature for anyone wanting to control the build process from within CC. My only concern is how will it effect my functionality.
On Feb 28, 1:39 am, Siddharth <[email protected]> wrote: > Continuous Integration is an interesting concept no doubt. It is what > PM's want. Build and Integration time is seldom assumed on the > critical path of any project. What is assumed is integration will be > smooth and seamless. Both of which depend on the maturity of the team > and the product. > > More than just seamless integration, projects need to be > "controllable" towards the end. And this control should be > configurable to enough to ensure no loss to productivity. The other > side of the same coin is too much process can over burden the project. > But, process is meant to be customized to ensure that the burden : > benefits ration are as less as possible. > > Now, coming to my point. A integration infrastructure needs to have a > controlled checkin process. A control checkin process should be linked > tightly with the build start time. It should be possible to specify a > date from when the controlled checkin will start. From this day > onwards, every checkin, should be approved by a user/group (commonly > known as a change review board). The review will be based on defect, > reproduction steps, code changes, fix changes (code and ANY change), > unit test review comments, people involved (lines of code changed, > should not be a metric here, makes no sense anyway, since we have the > actual code that we need to review before the checkin). A end time > should be defined for this approval/review process, beyond which the > auto build process will be delayed. OR we should be able to configure > approval/review process to be desirable (or mandatory). If a > approval / review process is active the communication on the dashboard > should reflect the results. Approval/Review process summary should be > displayed along with the build results. > > Build conducted with (in green) / without (in red) the approval/review > process. > Summary of Approval / Review by change control board > - total_checkins > - reviewed_checkins > - approved_checkins > - disapproved_checkins > - risks mitigated (by the change review board) - textual communication > to the team > - risks taken - textual communication to the team > - assumptions made - textual communication to the team > - Final Decision (Build Safe / Build At Risk / .... some more.. ) > > If this is a interesting idea, I am willing to work closely with the > implementation team. Please comment.