We use our source code repository to control our build content.  Since
we are a SCRUM shop and we perform releases every two weeks this is
not a feature that I would utilize.  This sounds more along the line
CMM or CMMI type of a process.  This would be a great feature for
anyone wanting to control the build process from within CC.  My only
concern is how will it effect my functionality.

On Feb 28, 1:39 am, Siddharth <[email protected]> wrote:
> Continuous Integration is an interesting concept no doubt. It is what
> PM's want. Build and Integration time is seldom assumed on the
> critical path of any project. What is assumed is integration will be
> smooth and seamless. Both of which depend on the maturity of the team
> and the product.
>
> More than just seamless integration, projects need to be
> "controllable" towards the end. And this control should be
> configurable to enough to ensure no loss to productivity. The other
> side of the same coin is too much process can over burden the project.
> But, process is meant to be customized to ensure that the burden :
> benefits ration are as less as possible.
>
> Now, coming to my point. A integration infrastructure needs to have a
> controlled checkin process. A control checkin process should be linked
> tightly with the build start time. It should be possible to specify a
> date from when the controlled checkin will start. From this day
> onwards, every checkin, should be approved by a user/group (commonly
> known as a change review board). The review will be based on defect,
> reproduction steps, code changes, fix changes (code and ANY change),
> unit test review comments, people involved (lines of code changed,
> should not be a metric here, makes no sense anyway, since we have the
> actual code that we need to review before the checkin). A end time
> should be defined for this approval/review process, beyond which the
> auto build process will be delayed. OR we should be able to configure
> approval/review process to be desirable (or mandatory). If a
> approval / review process is active the communication on the dashboard
> should reflect the results. Approval/Review process summary should be
> displayed along with the build results.
>
> Build conducted with (in green) / without (in red) the approval/review
> process.
> Summary of Approval / Review by change control board
> - total_checkins
> - reviewed_checkins
> - approved_checkins
> - disapproved_checkins
> - risks mitigated (by the change review board) - textual communication
> to the team
> - risks taken - textual communication to the team
> - assumptions made - textual communication to the team
> - Final Decision (Build Safe / Build At Risk / .... some more.. )
>
> If this is a interesting idea, I am willing to work closely with the
> implementation team. Please comment.

Reply via email to