Apologies for the non-CCP4 question, but I think this would of interest to anyone thinking of purchasing the 007 from Rigaku.

To praise the instrument, we have been able to evaluate crystals that were previously only assessable at the synchrotrons. The intensities are ten times that of the RU-H2R and the spots are beautiful. BUT, we had it installed in February 07 and since then we have not been able to use both ports simultaneously due to a problem with the shutter board (or shutters or both). I am curious to know whether we are the only ones with this problem where the generator sometimes goes off when both shutters are opened.

Thanks,

Deena
Deena Abells Oren, PhD
Laboratory of Molecular Biophysics
Rockefeller University
1230 York Ave
New York, NY 10021
phone: 212-327-7429

Reply via email to