Hello Vandana, so you are saying your Rfree=27.7 and Rwork=27.0.

Let's stop shaking the air with throwing out hypothesis (someone, likely you, will need to verify them and this is some work) and start with the simplest option -- look in PDB at the structures deposited at similar resolution as yours, that is in the range, say, from 2.9 to 3.1A:

Histogram of Rwork for all model in PDB at resolution 2.9-3.1:
    0.139 - 0.160      : 1
    0.160 - 0.181      : 16
    0.181 - 0.202      : 122
    0.202 - 0.223      : 251
    0.223 - 0.243      : 259
    0.243 - 0.264      : 161
    0.264 - 0.285      : 69 <<< your structure
    0.285 - 0.306      : 21
    0.306 - 0.327      : 8
    0.327 - 0.348      : 4
Histogram of Rfree for all model in PDB at resolution 2.9-3.1:
    0.181 - 0.205      : 4
    0.205 - 0.229      : 35
    0.229 - 0.254      : 128
    0.254 - 0.278      : 274 <<< your structure
    0.278 - 0.302      : 285
    0.302 - 0.326      : 127
    0.326 - 0.350      : 46
    0.350 - 0.375      : 9
    0.375 - 0.399      : 2
    0.399 - 0.423      : 2
Histogram of Rfree-Rwork for all model in PDB at resolution 2.9-3.1:
   -0.025 - -0.008     : 3
   -0.008 - 0.010      : 20  <<< your structure
    0.010 - 0.027      : 100
    0.027 - 0.045      : 269
    0.045 - 0.062      : 315
    0.062 - 0.080      : 133
    0.080 - 0.097      : 54
    0.097 - 0.115      : 12
    0.115 - 0.132      : 3
    0.132 - 0.150      : 3

Hm... I think you got the message. Not necessarily your structure is incorrect, it just simply needs some closer look and possibly some more work -:) It might turn out that a few cycles of refinement just enough.

Please let me know if you want to discuss it some more.

All the best!
Pavel.



On 10/9/09 12:28 AM, Vandana Kukshal wrote:
hi
i am solving one structure

in which after refinement i got R factor=27
and R free =27.7
i want to know that is it correct or i did some over refinment

the Resolution is 3.0 A

Reply via email to