Dear Almudena, Doing two different runs (1-900 and 1001-1200) will do what you want. You will have to do it from 2 different directories (called e.g. wedge1 and wedge2, or whatever). With XSCALE you can merge the runs.
Best, Herman Von: CCP4 bulletin board [mailto:[email protected]] Im Auftrag von Almudena Ponce Salvatierra Gesendet: Montag, 29. September 2014 11:57 An: [email protected] Betreff: [ccp4bb] XDS Dear all, I would like to ask something regarding XDS. Is it possible, without changing the Name of the Frames, to leave some out while processing? i.e. something like defining twice the data range DATA_RANGE= 1 900 !DATA_RANGE= 901 1000 DATA_RANGE= 1001 1200 Is there a way to do so? to leave out wedges like this? I have tried like so, but I have the Impression it only takes then the last number of Frames, in this example it would only take 1001 to 1200. Thanks a lot. Best wishes, Almudena -- Almudena Ponce-Salvatierra Macromolecular crystallography and Nucleic acid chemistry Max Planck Institute for Biophysical Chemistry Am Fassberg 11 37077 Göttingen Germany
