Dear Almudena,
Doing two different runs (1-900 and 1001-1200) will do what you want. You will 
have to do it from 2 different directories (called e.g. wedge1 and wedge2, or 
whatever). With XSCALE you can merge the runs.

Best,
Herman

Von: CCP4 bulletin board [mailto:[email protected]] Im Auftrag von Almudena 
Ponce Salvatierra
Gesendet: Montag, 29. September 2014 11:57
An: [email protected]
Betreff: [ccp4bb] XDS

Dear all,

I would like to ask something regarding XDS. Is it possible, without changing 
the Name of the Frames, to leave some out while processing?

i.e. something like defining twice the data range
DATA_RANGE= 1 900
!DATA_RANGE= 901 1000
DATA_RANGE= 1001 1200

Is there a way to do so? to leave out wedges like this? I have tried like so, 
but I have the Impression it only takes then the last number of Frames, in this 
example it would only take 1001 to 1200.

Thanks a lot.

Best wishes,

Almudena
--
Almudena Ponce-Salvatierra
Macromolecular crystallography and Nucleic acid chemistry
Max Planck Institute for Biophysical Chemistry
Am Fassberg 11 37077 Göttingen
Germany

Reply via email to