exec

thanks for the initiative, Mdzodzo will contribute 2 bags of cement only at 
mean time but what is lacking in this initiative is a pace setter. 
traditionally, people will always gauge their contributions basing on what 
balet or so & so has contributed

we will also add our captain hast and fenco on Rocky's laborers just to speed 
up the work and of course Stan of Disciples!!!

--- On Mon, 21/6/10, Mafuleka Barlett (Mr) <[email protected]> wrote:

From: Mafuleka Barlett (Mr) <[email protected]>
Subject: {CEZOBAL} REHABILITATION OF SILVER BASKETBALL COURT
To: [email protected], [email protected]
Cc: "Kingsley Gwaza" <[email protected]>, 
[email protected], [email protected], "HerbertChidaya" 
<[email protected]>, "Susan Mponda" 
<[email protected]>, [email protected], "Peter Gomani" 
<[email protected]>, [email protected], [email protected], "Dean Lungu" 
<[email protected]>, [email protected], "Mike Fluech" 
<[email protected]>, "Frank, Kalilombe," <[email protected]>, "Herbert" 
<[email protected]>, "Khama" <[email protected]>, 
[email protected], "Kingsley Gwaza" <[email protected]>, 
[email protected], "Peter Gomani" <[email protected]>, "Rocky Kaunda" 
<[email protected]>, [email protected], "Susan Mponda" 
<[email protected]>, [email protected], [email protected], 
[email protected], "dmafuleka" <[email protected]>, 
[email protected], [email protected], [email protected],
 [email protected], "Barlett Mafuleka 2" <[email protected]>, 
[email protected], "dmafuleka" <[email protected]>, "davies chikopa" 
<[email protected]>, [email protected], "Liz Magombo (Bunda-Ladies)" 
<[email protected]>, "kondwani (Bayonnets)" <[email protected]>, 
[email protected], "Jimmy Njewa" <[email protected]>, "Mimbulu Basketball 
Club" <[email protected]>, "Lilongwe Cougars" <[email protected]>, "Ian 
Msampha" <[email protected]>, "Limbani Yatina" 
<[email protected]>, [email protected], 
[email protected], [email protected], "Mphatso Malidadi" 
<[email protected]>, "Hope Chisamanga" <[email protected]>, 
"Kachikwati, Willard" <[email protected]>, "Humphrey 
Chipilingu" <[email protected]>, [email protected], "Nyirenda, 
Martin" <[email protected]>
Date: Monday, 21 June, 2010, 18:03




 
 







CEZOBAL FAMILY, 

 Please be advised that the CEZOBAL Executive
Committee will be carrying out some rehabilitation work on Silver Stadium
during the Mid-Season break to try and improve the standard of the Silver
basketball court. CEZOBAL is a big family and if we were to come together and
help each other in this initiative it will benefit all of us and the
generations to come. I have listed below materials which will be needed to help
with the rehabilitation of the court. Those of you who feel they can assist
with some materials listed below please contact me on 099 9919 328 and we will
make arrangements on when the materials you would like to assist with will be
needed. 

   

The following are the works which we plan to carry out
using the listed materials below:- 

1.      Reworking and plastering the existing
3 stands. 

2.      Building an additional 2 stands
on top of the existing 3 stands and plaster them as well. The extra 2 stands
are to act as protective cover for all the water and sand which move from higher
ground onto the existing stands as well as the playing surface. 

3.      Drainage for the water which
comes from the high ground 

4.      The boards will be reworked and
block board will be put on the front of the hoops so as to avoid the ball
bouncing off the board in an awkward way. The block boards will be painted 3
coats of oil paint so as to protect them to last a long time. 

5.      Resurfacing the cracked areas
around the playing area, and painting most of the playing area with different
colours.    

   

   


 
  
  ITEM 
  
  
  UNIT 
  
  
  QUANTITY 
  
  
  ESTIMATED
  UNIT RATE 
  
  
  TOTATL
  COST 
  
 
 
  
  Cement 
  
  
  Bags 
  
  
  50 
  
  
  MK2,700 
  
  
  MK135,000 
  
 
 
  
  Sand 
  
  
  Trips 
  
  
  5 
  
  
  MK12,000 
  
  
  MK60,000 
  
 
 
  
  Quarry Stone 
  
  
  Trips 
  
  
  3 
  
  
  MK15,000 
  
  
  MK45,000 
  
 
 
  
  Bricks 
  
  
  Trips 
  
  
  1 
  
  
  MK30,000 
  
  
  MK30,000 
  
 
 
  
  Paint 
  
  
  5 Litre tins 
  
  
  6 
  
  
  MK6,000 
  
  
  MK36,000 
  
 
 
  
  Block board 
  
  
  board 
  
  
  2 
  
  
  MK6,000 
  
  
  MK12,000 
  
 
 
  
  Total
  estimated cost of Materials 
  
  
  MK318,000 
  
 


  

   

You will notice that the cost of the installation of the
floodlights has not been included on the above list this is because we are yet 
to
find out how much it will cost. The poles which were donated by Alliance One 
have
been worked on and have been painted all what is left is them to be planted on
the Silver Court, but before this is done, the work listed above has to be
carried out. Rocky Kaunda has offered to have his boys to do all the work once
the materials are available and he will pay for their labour charges. 

   

   

 POWERED BY THE FOLLOWING SPONSORS:- 

   

                                                      

   

               
“In
Your Face” 

   



 



-- 

http://soyapi.com/owinna/cezobal2008

===================================

You received this message because you are subscribed to the Google

Groups "Central Zone Basketball League" group.

To post to this group, send email to [email protected]

To unsubscribe from this group, send email to

[email protected]

For more options, visit this group at

http://groups.google.com/group/cezobal?hl=en


      

-- 
http://soyapi.com/owinna/cezobal2008
===================================
You received this message because you are subscribed to the Google
Groups "Central Zone Basketball League" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to
[email protected]
For more options, visit this group at
http://groups.google.com/group/cezobal?hl=en

<<image001.jpg>>

<<image006.jpg>>

<<image007.jpg>>

<<image008.jpg>>

<<image009.jpg>>

Reply via email to