We are testing the following setup : 65XX-VSS - etherchannel - 3750E stack (2 switches) - teaming enabled servers
This should give maximal uptime, overriding defects on the router or 3750E switches. We intend to use these switches in L2 mode only, managing them via the mgmt fa0 interface. I'm now looking into the upgrading procedure for the stack, but I can't seem to find a way to do an upgrade in which at least of the 3750E's stays operational, thus minimalizing down time. As far as I can tell from the doc, there is no way to upgrade e.g. the master switch, have it reload (keeping the second switch operational), and after the master becomes operational, (auto-)upgrade the second switch. Am I missing something or is this scenario really not possible ? Another scenario would be removing the switch from the stack (after bringing down all ports first via console), changing the ip address of the switch, bringing the mgmt port back online, do the upgrade, bring the power down, reconnect it to the stack and the power up it again. Given the fact that the stack cables are rather fragile, this doesn't seem the right way to do, unless it is possible to shut down the stack ports by a CLI command ? Anyone suggestions, pointers to alternative upgrade procedures,... Thanks, Wim Holemans Network Services University of Antwerp Netwerkdienst Universiteit Antwerpen _______________________________________________ cisco-nsp mailing list cisco-nsp@puck.nether.net https://puck.nether.net/mailman/listinfo/cisco-nsp archive at http://puck.nether.net/pipermail/cisco-nsp/