Hi,

I have about 18 C3548 switches with UTP cross-over as a redundant link to 
the core C6009 switches (1 unit) and the production link of LX & SX GBIC.
When the production link is in operation, all the GBIC ports is in
forwarding
state. However when I attach the redundant UTP cable at 1 C3548 to the
another
C3548 (cascade), I wonder why they are still in forwarding state. Here's a
basic
layout.

        C3548    \                 /    C3548
  (utp) |            \   /        | (utp)
        C3548   ----    C6009   -----   C3548
  (utp) |            /       \    | (utp)
        C3548      /               \    C3548

How do I set the cascading port (as a redundant link) into blocking state?

Regards,
Ryan




Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=11623&t=11623
--------------------------------------------------
FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]

Reply via email to