Hi. This is the blending (projecting)
rule:
Rehab Medium category can be reached by
actually delivering 0 minutes but projecting in Section T at least 240 min/8
days.
Rehab High category can be reached by
actually delivering 65 minutes and projecting in Section T at least 520 min/8
days.
Both Rehab Very High and Ultra High require
the actual delivery of the required services/minutes/days.
Winona
-----Original Message-----
From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] Sent: Wednesday, January 28, 2004 5:31 PM To: [EMAIL PROTECTED] Subject: Re: PROJECTION OF MINUTES AT DAY 8 In a message dated 1/28/2004 2:56:37 PM Pacific Standard Time,
[EMAIL PROTECTED] writes:
My new Therapy Manager has questioned why we would need to use grace days 6 through 8 if he wasn't planning on attaining an RU or RV RUG level. I didn't really phrase my question correctly.
He doesn't understand why you would have a need to utilize grace days 6-8,
feeling that projection alone gives the RUG level.
Isn't there a minimum number of minutes to have been given by the 5
day Assessment, in conjunction with the projection, which gives the RUG level?
For example, the higher the number of minutes ALREADY given, in conjunction with
a good projection, would yield a higher RUG level?
Is this correct?
|
- PROJECTION OF MINUTES AT DAY 8 Nmcb40doc
- Re: PROJECTION OF MINUTES AT DAY 8 Nmcb40doc
- Re: PROJECTION OF MINUTES AT DAY 8 Winona M. Phelps
- Re: PROJECTION OF MINUTES AT DAY 8 Nmcb40doc
- RE: PROJECTION OF MINUTES AT DAY 8 Brenda Chance
- RE: PROJECTION OF MINUTES AT DAY 8 Brenda Chance