On Suhana: - Paint boot stripes (brightside or perfection, haven't decided yet but keeping original C&C red/blue/darker blue) - bottom paint - repack stuffing box - dismantle pedestal and inspect steering components, replace/repair as necessary - Ambitious but, repaint pedestal. - exhaust hose replacement - tune up the A4 (all ignition components and install new racor) - replace mast collar - rigging inspection - new halyards - washdown pump - install tank level monitor (thanks Fred)
We'll see how much of that I get done. Steve Suhana, C&C 32 Toronto On Fri, Mar 21, 2014 at 10:13 AM, Edd Schillay <[email protected]> wrote: > Listers, > > Now that Spring has finally sprung, I was curious to see what other > listers have planned for their Spring projects on their C&Cs. > > So far, planned for the Enterprise: > > > - Relocate engine gauges and move engine-starting switches. > - change transmission/throttle controls at helm > - New coat of Petit Vivid > - Add another coat or two of boot stripes > - New interior cushions > - Add cockpit lighting > - (Maybe) Bolt centerboard inside keel and cover up the "slot" > - Install bimini > - Redo the remaining floorboards > - Store spinnaker pole > - Install Tactick wind vane and repeater > - Service the refrigerator. > - Install two solar vents > > > > > All the best, > > Edd > > > Edd M. Schillay > Starship Enterprise > C&C 37+ | Sail No: NCC-1701-B > City Island, NY > Starship Enterprise's Captain's Log <http://enterpriseb.blogspot.com/> > > > _______________________________________________ > This List is provided by the C&C Photo Album > http://www.cncphotoalbum.com > [email protected] > >
_______________________________________________ This List is provided by the C&C Photo Album http://www.cncphotoalbum.com [email protected]
