On Suhana:

- Paint boot stripes (brightside or perfection, haven't decided yet but
keeping original C&C red/blue/darker blue)
- bottom paint
- repack stuffing box
- dismantle pedestal and inspect steering components, replace/repair as
necessary
- Ambitious but, repaint pedestal.
- exhaust hose replacement
- tune up the A4 (all ignition components and install new racor)
- replace mast collar
- rigging inspection
- new halyards
- washdown pump
- install tank level monitor (thanks Fred)

We'll see how much of that I get done.

Steve
Suhana, C&C 32
Toronto


On Fri, Mar 21, 2014 at 10:13 AM, Edd Schillay <[email protected]> wrote:

> Listers,
>
> Now that Spring has finally sprung, I was curious to see what other
> listers have planned for their Spring projects on their C&Cs.
>
> So far, planned for the Enterprise:
>
>
>    - Relocate engine gauges and move engine-starting switches.
>    - change transmission/throttle controls at helm
>    - New coat of Petit Vivid
>    - Add another coat or two of boot stripes
>    - New interior cushions
>    - Add cockpit lighting
>    - (Maybe) Bolt centerboard inside keel and cover up the "slot"
>    - Install bimini
>    - Redo the remaining floorboards
>    - Store spinnaker pole
>    - Install Tactick wind vane and repeater
>    - Service the refrigerator.
>    - Install two solar vents
>
>
>
>
> All the best,
>
> Edd
>
>
> Edd M. Schillay
> Starship Enterprise
> C&C 37+ | Sail No: NCC-1701-B
> City Island, NY
> Starship Enterprise's Captain's Log <http://enterpriseb.blogspot.com/>
>
>
> _______________________________________________
> This List is provided by the C&C Photo Album
> http://www.cncphotoalbum.com
> [email protected]
>
>
_______________________________________________
This List is provided by the C&C Photo Album
http://www.cncphotoalbum.com
[email protected]

Reply via email to