The water is still a bit too solid here for launching

 

From: CnC-List [mailto:[email protected]] On Behalf Of Joel
Aronson
Sent: Friday, March 21, 2014 11:57 AM
To: [email protected]
Subject: Re: Stus-List Spring Projects

 

Completed (not by me)

Cutlass bearing

Re do Max Prop

repack stuffing box

Paint bottom (next week)

 

(by me)

new clutches - port side

2 new thru hulls/seacocks in bow

New hoses for head/relocate vented loops for more storage under vee
berth

Remove/replace plotter

Boot stripes -  Red/Sapphire Blue

Built emergency rudder and MOB pole

 

Still to do:

install new triducer

replace outhaul and reefing lines

finish gybe preventer

connect plotter to VHF

locate/repair leak (probably from winch)

install MOB pole holder a/k/a a piece of PVC

 

Launch in one week!!

 

Joel

 

On Fri, Mar 21, 2014 at 10:23 AM, Stevan Plavsa <[email protected]>
wrote:

On Suhana:

 

- Paint boot stripes (brightside or perfection, haven't decided yet but
keeping original C&C red/blue/darker blue)

- bottom paint

- repack stuffing box

- dismantle pedestal and inspect steering components, replace/repair as
necessary

- Ambitious but, repaint pedestal. 

- exhaust hose replacement

- tune up the A4 (all ignition components and install new racor)

- replace mast collar

- rigging inspection 

- new halyards

- washdown pump

- install tank level monitor (thanks Fred)

 

We'll see how much of that I get done.

 

Steve

Suhana, C&C 32

Toronto

 

On Fri, Mar 21, 2014 at 10:13 AM, Edd Schillay <[email protected]> wrote:

        Listers,

         

        Now that Spring has finally sprung, I was curious to see what
other listers have planned for their Spring projects on their C&Cs. 

         

        So far, planned for the Enterprise:

         

        *       Relocate engine gauges and move engine-starting
switches. 
        *       change transmission/throttle controls at helm
        *       New coat of Petit Vivid
        *       Add another coat or two of boot stripes
        *       New interior cushions
        *       Add cockpit lighting
        *       (Maybe) Bolt centerboard inside keel and cover up the
"slot"
        *       Install bimini
        *       Redo the remaining floorboards
        *       Store spinnaker pole
        *       Install Tactick wind vane and repeater
        *       Service the refrigerator.
        *       Install two solar vents

         

         

         

        All the best,

         

        Edd

         

         

        Edd M. Schillay

        Starship Enterprise

        C&C 37+ | Sail No: NCC-1701-B

        City Island, NY 

        Starship Enterprise's Captain's Log
<http://enterpriseb.blogspot.com/> 

         

         

        _______________________________________________
        This List is provided by the C&C Photo Album
        http://www.cncphotoalbum.com
        [email protected]

 


_______________________________________________
This List is provided by the C&C Photo Album
http://www.cncphotoalbum.com
[email protected]





 

-- 
Joel 
301 541 8551 

_______________________________________________
This List is provided by the C&C Photo Album
http://www.cncphotoalbum.com
[email protected]

Reply via email to