Thanks, Chuck and Alan. I had not planned on fully dropping the keel this
year. The boat is currently in Jamestown RI. I will be sailing her up to
Beverly, MA after she is launched. The mast is currently up,and I have been
quoted 500 each way to unstep and step. I was hoping to hold off until next
year to unstep. This year,  I was planning on just grinding out the joint
(which I have already done) tightening the bolts with new plates/washers,
and fairing the joint with GFlex and fairing filler (303?). There is
currently 4200 or something similar in the keel hull joint. I am planning
to drop the mast next fall, and then fully assessing/addressing the mast
step. My surveyor thought the mast step was in good condition, although the
mast was up when surveyed.  The boat, based on what I could tell by the C&C
plate in the back of the cockpit, was built in Niagara on the Lake. From
what I have read elsewhere, the mast steps from that facility were more
solidly than those built in RI. Should I also glass the joint and then
re-grind in the fall? Other comments? Safety issues?
Does anyone have the washer sizes?
Thanks.
Best,
David Swensen
Freya
1985 35 MK III
_______________________________________________

Thanks everyone for supporting this list with your contributions.  Each and 
every one is greatly appreciated.  If you want to support the list - use PayPal 
to send contribution --   https://www.paypal.me/stumurray

Reply via email to