[ 
https://issues.apache.org/jira/browse/SAMZA-401?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Chris Riccomini updated SAMZA-401:
----------------------------------
    Affects Version/s: 0.8.0

> Add utilization metrics for the event loop
> ------------------------------------------
>
>                 Key: SAMZA-401
>                 URL: https://issues.apache.org/jira/browse/SAMZA-401
>             Project: Samza
>          Issue Type: Improvement
>          Components: metrics
>    Affects Versions: 0.8.0
>            Reporter: Yan Fang
>              Labels: newbie++
>
> As discussed 
> [here|https://issues.apache.org/jira/browse/SAMZA-349?focusedCommentId=14116417&page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel#comment-14116417],
> {quote}
> it would be useful to add "utilization" (aka "duty cycle") as a metric, which 
> is the sum of all the timings divided by the window length. That can tell you 
> how much idle time there is in the event loop (how much headroom before the 
> job will start falling behind).
> {quote}
> It is useful to add this metric for the event loop.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to