[
https://issues.apache.org/jira/browse/SAMZA-401?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Chris Riccomini updated SAMZA-401:
----------------------------------
Labels: newbie++ (was: )
> Add utilization metrics for the event loop
> ------------------------------------------
>
> Key: SAMZA-401
> URL: https://issues.apache.org/jira/browse/SAMZA-401
> Project: Samza
> Issue Type: Improvement
> Components: metrics
> Affects Versions: 0.8.0
> Reporter: Yan Fang
> Labels: newbie++
>
> As discussed
> [here|https://issues.apache.org/jira/browse/SAMZA-349?focusedCommentId=14116417&page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel#comment-14116417],
> {quote}
> it would be useful to add "utilization" (aka "duty cycle") as a metric, which
> is the sum of all the timings divided by the window length. That can tell you
> how much idle time there is in the event loop (how much headroom before the
> job will start falling behind).
> {quote}
> It is useful to add this metric for the event loop.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)