DanielLeens commented on issue #11364:
URL: https://github.com/apache/seatunnel/issues/11364#issuecomment-4940964351

   I agree with @nzw921rx on adding a small flowchart.
   
   For this STIP, a compact end-to-end diagram would help a lot more than extra 
prose alone. The most useful v1 diagram would show:
   1. which signals are connector-reported
   2. which fields are framework-computed
   3. where checkpoint / restore visibility is attached
   4. how the optional `cdcProgress` section is exposed in job detail
   5. how connector-reported `STALLED` is distinguished from framework 
timeout-based `STALLED`
   
   I would keep that diagram scoped to the current v1 path, not a future full 
timeline/history design. If you add it to the issue body or the STIP draft and 
also reference it in the dev@ discussion, the review should be much easier to 
converge.


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to