DanielLeens commented on PR #11897: URL: https://github.com/apache/seatunnel/pull/11897#issuecomment-5379383160
Thanks @zhang-arvin — I independently re-checked all three points: 1. Path filter glob: confirmed both `docs/en` and `docs/zh` now list the corrected `connector-cdc/**` plus `connector-kafka/**`, `connector-jdbc/**`, `connector-file/**`, `connector-fake/**`. 2. Endless scenario verification: confirmed the `after_restore.sh` hook and the "Endless scenario verification" section are present in the Compatibility Contract. 3. PR description: confirmed directly via `gh pr view` — the body now reads "Part of #11356." instead of "Closes #11356", so merging this won't prematurely auto-close the tracking issue while Phase 2b-2d are still open. That closes out the one item (Issue 1) that was keeping this at "ready to merge after fixes" in my last review. I don't have anything further to add — nice work getting all three points (including @goutamadwant's two catches) addressed cleanly. -- This is an automated message from the Apache Git Service. To respond to the message, please log on to GitHub and use the URL above to go to the specific comment. To unsubscribe, e-mail: [email protected] For queries about this service, please contact Infrastructure at: [email protected]
