[ https://issues.apache.org/jira/browse/HADOOP-4053?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12639944#action_12639944 ]
Hadoop QA commented on HADOOP-4053: ----------------------------------- -1 overall. Here are the results of testing the latest attachment http://issues.apache.org/jira/secure/attachment/12392190/HADOOP-4053-v5.5.patch against trunk revision 704989. +1 @author. The patch does not contain any @author tags. +1 tests included. The patch appears to include 12 new or modified tests. +1 javadoc. The javadoc tool did not generate any warning messages. +1 javac. The applied patch does not increase the total number of javac compiler warnings. -1 findbugs. The patch appears to cause Findbugs to fail. +1 Eclipse classpath. The patch retains Eclipse classpath integrity. -1 core tests. The patch failed core unit tests. -1 contrib tests. The patch failed contrib unit tests. Test results: http://hudson.zones.apache.org/hudson/job/Hadoop-Patch/3467/testReport/ Checkstyle results: http://hudson.zones.apache.org/hudson/job/Hadoop-Patch/3467/artifact/trunk/build/test/checkstyle-errors.html Console output: http://hudson.zones.apache.org/hudson/job/Hadoop-Patch/3467/console This message is automatically generated. > Schedulers need to know when a job has completed > ------------------------------------------------ > > Key: HADOOP-4053 > URL: https://issues.apache.org/jira/browse/HADOOP-4053 > Project: Hadoop Core > Issue Type: Improvement > Components: mapred > Affects Versions: 0.19.0 > Reporter: Vivek Ratan > Assignee: Amar Kamat > Priority: Blocker > Fix For: 0.19.0 > > Attachments: HADOOP-4053-v1.patch, HADOOP-4053-v2.patch, > HADOOP-4053-v3.1.patch, HADOOP-4053-v3.2.patch, HADOOP-4053-v4.1.patch, > HADOOP-4053-v4.patch, HADOOP-4053-v5.2.patch, HADOOP-4053-v5.3.patch, > HADOOP-4053-v5.4.patch, HADOOP-4053-v5.5.patch > > > The JobInProgressListener interface is used by the framework to notify > Schedulers of when jobs are added, removed, or updated. Right now, there is > no way for the Scheduler to know that a job has completed. jobRemoved() is > called when a job is retired, which can happen many hours after a job is > actually completed. jobUpdated() is called when a job's priority is changed. > We need to notify a listener when a job has completed (either successfully, > or has failed or been killed). -- This message is automatically generated by JIRA. - You can reply to this email to add a comment to the issue online.