I have a question regarding proper strategy for managing repositories on the
download server that are referenced by simrel .b3aggrcon files.

 

I just updated Sapphire contribution to reference [1], which is the final
contribution but we aren't officially calling it final yet. Per Final Daze
document, on 6-25, I will copy this repository to [2] to make the release
official. Then I'd like to clean up old 0.5 pre-release downloads. How do I
safely do that since RC4 is still referenced by a .b3aggrcon file? Since
further aggregator builds aren't expected, do I update .b3aggrcon file on
6-25 to point to [2] and remove RC4 download? Do I wait until after 6-27 to
do this?

 

Thanks,

 

- Konstantin

 

[1] : http://download.eclipse.org/sapphire/0.5.0.RC4/repository

[2] : http://download.eclipse.org/sapphire/0.5.0/repository

 

 

_______________________________________________
cross-project-issues-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev

Reply via email to