Lots of activities today, going much better than yesterday. Appears nearly 
everyone is mostly "in", some waiting for the BIRT fix. One day to go!

amp.b3aggrcon - org.eclipse.simrel.build
birt.b3aggrcon - org.eclipse.simrel.build
dltk.b3aggrcon - org.eclipse.simrel.build (2 matches)
egit.b3aggrcon - org.eclipse.simrel.build
mat.b3aggrcon - org.eclipse.simrel.build
soa-bpel.b3aggrcon - org.eclipse.simrel.build
webtools.b3aggrcon - org.eclipse.simrel.build

Thanks for everyone's attention and quick fixes when the aggregation does 
break. 

We don't have to be perfectly clean for M4, but for those 64 missing 
about.html 
http://build.eclipse.org/simrel/kepler/reporeports/reports/layoutCheck.txt

or 8 incorrect or missing license files in features, 
http://build.eclipse.org/simrel/kepler/reporeports/reports/licenseConsistency.html

be sure to set aside some time in January to fix these types of issues 
early, if you don't fix for M4, and not leave to the very end. 

Thanks, 
_______________________________________________
cross-project-issues-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev

Reply via email to