|
On 03/15/2013 01:51 PM, Ed Willink
wrote:
Hi WayneNo. The project description is the project description. The PMI does capture revisions (using Drupal's support for this), but I have no intention of leveraging this for the simultaneous releases page. The description I mentioned is the description of the release. This is part of the release record. No. Then you will have two separate copies.The PMI stores the plan information in a database. Drupal provides some revision control that can be leveraged here. When I did the import of the existing information, I pulled in project plans where I could find them. It was a one-way process. You must choose to either continue to run with an XML file, or you can use the form elements in the PMI. There is no plan to attempt to coordinate these. Nope.
--
Wayne Beaton Director of Open Source Projects, The Eclipse Foundation Learn about Eclipse Projects ![]() |
_______________________________________________ cross-project-issues-dev mailing list [email protected] https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev

